Delivering High-Strength, Regulated Structural Infrastructure for Nigeria’s Utility and Electrification Networks.
Established in 2017, SSK Integrated Services Limited combines cutting-edge technical expertise with rigid quality management systems to provide turnkey electrical infrastructure and civil engineering services. We build quality into our raw materials, casting methodologies, and rigorous validation tests to consistently exceed industry and regulatory requirements.
Our Services
Need Any
Consultation?
Supply, Delivery, and Erection & Installation of Concrete Poles
SERVICE OVERVIEW:
We bridge the gap between manufacturing and structural field deployment.
THE TECHNICAL EDGE:
- Dedicated Logistics Fleet:
Equipped with a dedicated company fleet of heavy-duty crane-equipped transport trucks, ensuring prompt delivery.
- Resistance to Transit Stress::
Due to the precise circular section of our poles, they maintain uniform structural resistance against handling and transport shocks.
- Turnkey Site Erection:
Our specialized field engineers manage excavation, structural placement alignment, and anchor depths matching regulatory codes.
- Prefabricated Ease of Assembly:
Every pole is delivered with special prefabricated channels to allow rapid earthing connectivity and hassle-free assembly of streetlights or cross-arm utility fittings.
A showcase of a few of our high-voltage and low-voltage concrete pole supply contracts
Project Title: SS+GS–CEIP Ogbotobo Transmission Node Project
Contractor: PIMO
Deployment: 50 Units of 10.40m Heavy-Duty Concrete Poles
Timeline: Completed – August 2021
Engineering Milestone: Premium structural density verified with a compressive cube strength of 44.44 N/mm² at 28 days.
Project Title: SS+GS–CEIP Tunu Node Transmission Project
Contractor: Westfield
Deployment: 173 Units of 10.40m Heavy-Duty Concrete Poles
Timeline: Completed – December 2021
Engineering Milestone: Achieved an exceptional compressive cube strength of 46.52 N/mm² at the full 28-day curing cycle.
Project Title: CEIP – Otumara Section Two (Ugborodo Community Network)
Contractor: Tadoro Nigeria
Deployment: 5 Units of 12.20m Transmission Poles & 83 Units of 10.40m Heavy-Duty Poles
Timeline: Completed – August 2024
Engineering Milestone: Structural integrity verified with a load strength of 43.22 N/mm² at 28 days.
Project Title: CEIP – Escravos Infrastructure Project (Phase I)
Contractor: Realhatt Venture
Deployment: 4 Units of 12.20m Transmission Poles & 227 Units of 10.40m Heavy-Duty Poles
Timeline: Completed – July 2024
Engineering Milestone: Confirmed structural performance with a strength metric of 41.48 N/mm² at 28 days.
Project Title: CEIP – Escravos Infrastructure Project (Phase II)
Contractor: Tarimore
Deployment: 4 Units of 12.20m Transmission Poles & 498 Units of 10.40m Heavy-Duty Poles
Timeline: Completed – July 2024
Engineering Milestone: Unyielding structural validation recording 43.22 N/mm² compressive strength at 28 days.
Project Title: SS+GS–CEIP Iduwini Cluster Town Network
Contractor: S2 Generation Services
Deployment: 55 Units of 8.53m Low-Voltage Distribution Poles
Timeline: Completed – January 2025
Engineering Milestone: High mechanical durability achieved with a cube strength of 44.44 N/mm² at 28 days.
Project Title: SS+GS–CEIP Ogbotobo Transmission Node Project (Expansion I)
Contractor: PIMOMAFUTA
Deployment: 350 Units of 10.40m Heavy-Duty Concrete Poles
Timeline: Completed – August 2025
Engineering Milestone: Defection-resistant build quality hitting 43.22 N/mm² at 28 days.
Project Title: SS+GS–CEIP Ogbotobo Transmission Node Project (Expansion II)
Contractor: MOPROJECT
Deployment: 1,000 Units of 10.40m Heavy-Duty Concrete Poles
Timeline: Completed – December 2025
Engineering Milestone: Large-scale fabrication consistency verified at 43.22 N/mm² compressive strength at 28 days.